
Originally Posted by
Graeme
Hi Stusk1
Many of us are out there working on our next designs, but unfortunately it takes time to get from the drawing stage to a completed model. After I finish all the designing which can take some time ;) I draw up all the technical drawings for all the different companies, case, crystal, dial, hands, etc. it then takes around 12 months before I will have anything to show. It's a long process but I believe it's better than simply picking ready made parts from a catalogue and having a product out in 1-2 months.
I think a lot of small brands started around the same time so there was a boom of different watches released all at the same time. Now I think it will be more spread out, but we are still here :)
Regards
Graeme